mrnewway
08-16-2007, 12:32 AM
:bannana: I would like to thank all the members that helped out on some of the projects in the gas engine area earlier this year.
Project 1 Install a new metal roof on the 150 Snow building.( this should have been done at least 5 FIVE YEARS AGO lots of extra work and material.)
Project 2 Upgrade electrical service to the 150 Snow building.(this year they should be able to turn on more lights and not like in the past 5, 200 watt lamps.)
Project 3 Addition to the Delevern building to house the little baby Akaroid engine.(I sure hope this will be a nice addition to the gas engine area).
Project 4 Not sure if any plants got put in the planter by the OTTO building but I hope so, I ran out of time and had to go back home. Again thanks to all that helped it is very much appreciated.
There is still lot of painting that should be done before the show, ask Keven W.
Jim out west:bannana: :bannana: :bannana:
Project 1 Install a new metal roof on the 150 Snow building.( this should have been done at least 5 FIVE YEARS AGO lots of extra work and material.)
Project 2 Upgrade electrical service to the 150 Snow building.(this year they should be able to turn on more lights and not like in the past 5, 200 watt lamps.)
Project 3 Addition to the Delevern building to house the little baby Akaroid engine.(I sure hope this will be a nice addition to the gas engine area).
Project 4 Not sure if any plants got put in the planter by the OTTO building but I hope so, I ran out of time and had to go back home. Again thanks to all that helped it is very much appreciated.
There is still lot of painting that should be done before the show, ask Keven W.
Jim out west:bannana: :bannana: :bannana: